How Much Does a Renovation Cost in Australia?
Renovation budgets fail for predictable reasons: the works are estimated but the fees, approvals, temporary living and contingency are not. This guide sets out every line a realistic Australian renovation budget should contain.
Last reviewed: 4 August 2026
On this page
How a renovation budget is structured
- Base works: the trades and materials, room by room.
- Preliminaries: demolition, waste removal, site protection, scaffolding.
- Professional fees: designer, draftsperson, engineer, certifier, project management.
- Statutory costs: Council or private certifier approvals, inspections.
- Temporary living or storage while the property is unusable.
- Contingency: a percentage of the total, not an afterthought.
What actually drives the number
Scope, access and the age of the property drive cost more than finish selection. Moving plumbing or removing structure costs far more than replacing what is already there in the same location.
- Wet areas — kitchens and bathrooms are the most expensive rooms per square metre.
- Structural change, which brings in engineers and approvals.
- Older properties: asbestos, lead paint, outdated wiring and plumbing.
- Difficult site access, which affects nearly every trade's price.
Contingency is not optional
A contingency of 10–20% is standard practice, weighted toward the higher end for older properties and anything structural. If the contingency is untouched at the end, you have simply come in under budget.
Getting quotes you can compare
- Write a scope document so every builder is pricing the same job.
- Ask for itemised quotes, not a single lump sum.
- Check licences and insurance before comparing prices.
- Confirm what is excluded — exclusions are where budgets blow out.
Need help with a Council matter?
Ask CADRO
Tell us what you need and receive a customised quote. Or explore our Council Process Checklists.
Request a QuoteFrequently asked questions
What contingency should I use for a renovation?
10–20% of total project cost is a common range in Australia, with older homes and structural works at the higher end.
Do I need Council approval to renovate?
It depends on the works and your state and Council. Cosmetic work is often exempt, while structural change, extensions and some wet-area work generally require approval. Confirm with your Council or a private certifier before you start.
Are the calculator's default figures real quotes?
No. Every figure in the CADRO calculators is an editable starting point for your own numbers, not a market rate or a quote.
Keep researching
Disclaimer
CADRO provides general educational information, templates, checklists and preliminary calculation tools only. It does not provide legal, financial, taxation, lending, building, engineering, surveying, planning or property advice. Information and requirements vary between properties, Councils, states and territories and may change over time. Users must independently verify information and obtain appropriate professional advice before buying, selling, renovating, building, investing or developing.